Construction of this narrow-gauge railway from St. John’s to Port aux Basques was commenced in 1881 and completed in 1893 by R.G. Reid; abandoned in 1993.
Construction of this narrow-gauge railway from St. John’s to Port aux Basques was commenced in 1881 and completed in 1893 by R.G. Reid; abandoned in 1993.